Energy wells for 30 homes in Hole municipality

Energy wells for 30 homes in Hole municipality
GTML carried out the first part of an energy project in Hole municipality in July 2022. Four energy wells were drilled and collectors installed as planned.
The wells are drilled to a depth of 480 meters in sandstone, and a new type of collector is used to achieve a more efficient energy uptake from the wells.
The energy wells are placed under the planned buildings.
The heating central, which will supply both heat and hot water, will be installed during the construction period in 2023.
The client is Ringerikskraft Nærvarme.
Wells
Four wells to 480 m with oval collector
Energy solution
Heating for 30 homes
Energy system
Energy central with an 85 kW heat pump